S/ A-1 shut down at 213 sec due to failure of its turbopump assembly. The vehicle
continued flight till 221 seconds when erratic attitude rates were noted. At 229
seconds, the impact point stopped. At 257 seconds, the pressure dropped to zero
in the stage-1 thrust-chamber assembly 2. At the same time, stages 1 and 2
separated as stage 2 ignited. After this time, stage-2 attitude rates were erratic.
Destruct was sent by the RSO at 273 seconds.
307. 34D (AFSC), 18 Apr 86, Response Mode 4, Flight Phase 0: At about 8.8 seconds
after liftoff, the insulation and case of SRM No. 2 debonded resulting in case
rupture immediately thereafter. The core vehicle was destroyed by fragments
from the ruptured motor. Auto-destruct was activated on SRM-1 at 9.0 seconds.
311. 34D-3/Transtage, 2 Sep 88, Response Mode NA, Flight Phase 5: Transtage
pressurization system failed due to damage to the upper portion of the transtage
fuel tank and pressurization lines. A_ leak of 1,340 pounds occurred during park
orbit, and a large helium-tank gas leak occurred during transtage first burn. Not
enough helium was left in system to allow start of second bum. The payload was
left in a geostationary transfer orbit.
315. Titan IV-1/IUS, 14 June 89, Response Mode NA, Flight Phase 1: Late in Stage-1
burn, one of the engines failed and shut down. The other engine was able to
gimbal sufficiently to maintain control until propellant depletion. Trajectory
inaccuracies were compensated for during Stage-2 burn, and the mission was a
success.
319. Commercial Titan, 14 Mar 90, Response Mode NA, Flight Phase 2.5 and 5: Boost
phase was satisfactory. The payload separation system was designed for two
satellites and had two discrete outputs from the missile guidance computer
(MGC), but for this mission it carried only a single satellite. The wiring team
miswired the harness, which connected the MGC payload-separation discretes to
the payload separation device, so the satellite never received the separation signal.
PKM and satellite did not separate from Stage II resulting in low-earth elliptical
orbit. Ground controllers were able to separate satellite hours later but PKM
remained attached to Stage II.
328. IV, 2 Aug 93, Response Mode 4, Flight Phase 0: A leak occurred in SRM#l at 99.9
seconds that rapidly enveloped the vehicle in propellant gases. Approximately
1.6 seconds later the vehicle blew up and disintegrated, apparently due to
activation of the inadvertent-separation destruct system.
. Destruct was
transmitted at 104.5 seconds.
329. II/SLV (Landsat 6), 5 Oct 93, Response Mode 4, Flight Phase 2: Following a
successful Titan-II second-stage burn and after payload separation, the apogee-
kick motor failed to ignite and circularize the highly-elliptical orbit. The Landsat
payload and Titan II followed a ballistic trajectory back into the atmosphere
where bumup occurred.
9/10/96
163
RTI
Community corrections
No user corrections yet.
Comments
No comments on this document yet.
Bottom Reader Ad Slot
Bottom Reader Ad Slot placeholder
If you would like to support SpookStack without paying out of pocket, please consider allowing advertising cookies. It helps cover hosting costs and keeps the archive free to browse. You can change this choice at any time.
Continue Exploring
Explore This Archive Cluster
Broad Topic Hub
Topic Hub
ufo
Related subtopics
Subtopic
Subtopic
Subtopic
Subtopic