◆ Document Timeline (1)
2025
Oct 7, 2025
DOW-UAP-D10, Mission Report, Middle East, May 2022
6
FROM 0958Z TO 2036Z, 1.4a CONDUCTED TARGET DEVELOPMENT ON OP 1.4a WITH A LAST ENGINE SHUT-DOWN TIME OF 0014Z. • Classification Source (MS or Classification Guide ID): MS